Planning Guide for the Connector for SAP Landscape Management
Differentiation between homogeneous and heterogeneous SAP system copy
In order to be able to work with the most up-to-date data possible on the development and quality assurance systems, it is necessary to bring an up-to-date production status onto these systems. This is often done via a complete system copy (production system -> development system, production system -> quality assurance system) and is very error-prone and user-intensive in ad-hoc configuration (especially if each developer/customizing user is responsible for saving the transports and importing them again after the copy). Every SAP system copy then carries the risk of losing the development status achieved and can lead to inconsistencies in programs and customizing, and any damage repair is usually very time-consuming.

Such system copies, with their enormous manual effort and SAP checklists that are often hundreds of items long, must be performed before every refresh. Usually, three to four days have to be planned for this, during which the QA system - which in two-tier SAP environments is also the development system - is not available for the actual work. The delay is actually only caused by the meticulous matching of trivial things, such as directory names. Because such SAP system copies have to be created for each SAP application on the QA system and can thus quickly require dozens of system copies, they tie up a lot of resources and staff.
Copying needs to be done skillfully
Typically, the "homogeneous SAP system copy" process involves a large number of manual activities. A certain skill level is required for this, which leads to the fact that usually the employees of the SAP Basis department or external service providers realize the system copy. Depending on the structure and size of the systems, this process can take anywhere from hours to several days. In addition to making the target systems unavailable to operations and project teams, system and landscape copies also block SAP Basis administrators. Other challenges include the varying duration and quality (completeness) of the results depending on the processor, time dependency on the employees performing the work, etc..

From now on, this will be easier. "Shortcut for SAP Systems" contributes to a time-optimized execution of this complex process, no matter when and at what frequency, and while maintaining a high degree of flexibility even in changing environments.


If this takes several days, the response times of the productive system deteriorate.